Named supplier in construction contracts
Naming suppliers allows the client to influence the main contractor's selection of suppliers, whilst leaving responsibility for their performance with the main contractor.
To name suppliers, the client first identifies a list of potential suppliers. They may invite these potential suppliers to submit tenders. The client then names a short-list of acceptable suppliers in the tender documents for the main construction contract. The tender documents allow for the named suppliers by including a provisional sum.
When tendering for the main contract, the main contractor makes allowances for mark up, attendance and programme in relation to the named suppliers. Once appointed, the successful contractor seeks tenders from the named suppliers (although they may reasonably object to any of them). If the client previously sought tenders form the named suppliers, they may pass these on to the main contractor, although it is the responsibility of the main contractor to negotiate an actual price.
Once the main contractor has selected and appointed a supplier, the provisional sum is replaced with the actual price agreed.
The main contractor pays the named supplier and the main contractor is responsible for their works. However, if the materials or goods supplied turn out not to be fit for purpose, then whoever named them will be responsible, not the contractor, unless the contractor was able to choose from a number of products available from the named supplier and they selected one that was unfit for purpose when others were available.
On public sector projects, a supply contract for which the client intends to provide a named list of possible suppliers may be subject to the requirements of the OJEU procurement rules.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February